Work party Saturday 5th August 2017

10:00 am with wheelbarrows and shovels at the choir hall.

Great team of lads from the ranks made life a lot easier and the work was done with the minimum of sweat.

Many thanks to all and congratulations to Ken Foster for all his hard preparation work.